Construction Stormwater · NPDES

SWPPP Requirements in South Dakota

Disturbing an acre or more in South Dakota means a SWPPP before you break ground. Here is what the state requires — permit, filing, and inspections — and how to be inspection-ready in minutes.

Compliance SnapshotSD
Permitting authorityDANR
General permitSDR100000
Plan nameSWPPP
Engineer stampNot required
1 ac
Disturbance threshold
7–14 day
Routine inspection cycle — 7-day schedule or 14-day schedule with storm inspections
>0.25 ″
Rain above this depth triggers inspection (14-day schedule with storm inspections only)
SDR100000
NPDES general permit

Who needs a SWPPP in South Dakota?

Any construction project that disturbs one acre or more — or is part of a larger common plan of development reaching one acre — needs a SWPPP under South Dakota permit SDR100000.

South Dakota runs its own delegated stormwater program. Operators obtain coverage from DANR under General Permit Authorizing Stormwater Discharges Associated with Construction Activities (SDR100000) (SDR100000), not directly from the EPA. A small subdivision, a solar pad, and a road-widening project all clear the same one-acre line.

South Dakota adds requirements worth flagging early: Submit the NOI (signed by the project owner) through EPA’s NPDES eReporting Tool (NeT) at least 15 calendar days before construction starts; SDDANR notifies coverage electronically (Sections 2.4, 2.7); Submit a Contractor Authorization Form for each entity responsible for earthwork or installing and maintaining stormwater controls as soon as the contractor is identified (Section 2.4.1); Post a notice visible from the nearest public road with the general permit number and a project contact name and phone number (Section 2.10); Dewatering discharges: monitor visually; if solids are visible add BMPs and sample total suspended solids daily, ceasing the discharge if any sample exceeds 53 mg/L; obtain a Temporary Water Use Permit; no chemicals without SDDANR approval (Section 3.21); Cover or temporarily stabilize stockpiles unused for 14 or more days (Section 3.18.4.b); Notify other operators within 24 hours of a SWPPP change that affects them (Section 5.5.5); Submit the NOT through NeT within 30 calendar days of final stabilization and removal of temporary controls, or of obtaining alternative coverage (Section 2.6).

What the plan must contain

A South Dakota SWPPPis the site's compliance binder — the document an inspector opens first. It documents:

  1. 1Site & project descriptionTotal and disturbed acreage, soils, slopes, and the sequence of construction.
  2. 2Receiving waters & discharge pointsWhere stormwater leaves the site and the waterbodies it reaches.
  3. 3Erosion & sediment control BMPsSilt fence, stabilized entrances, inlet protection, and stabilization measures.
  4. 4Inspection schedule & recordsDated, signed inspection logs and the corrective actions taken.
  5. 5Operator certificationThe SWPPP is signed by the legally responsible party before work begins.

Required and conditional BMPs

Best management practiceCategoryStatus
Perimeter silt fence / sediment barrierSediment controlRequired
Stabilized construction entranceTracking controlRequired
Storm drain inlet protectionSediment controlRequired
Soil stabilization (seeding, mulch, blankets)Erosion controlRequired
Concrete washout containmentGood housekeepingRequired
Sediment basin or trapSediment controlConditional
Dewatering / turbidity controlsPollution preventionConditional

Filing your Notice of Intent

Submit the Notice of Intent (Appendix A) electronically through EPA’s NPDES eReporting Tool (NeT) via CDX at least 15 calendar days before construction begins; the NOI must be signed by the project owner.

A Notice of Termination closes coverage once the site reaches final stabilization. Keeping the SWPPP and its inspection records on site is what keeps a project clear of stop-work orders.

Inspection requirements

The permit allows 2 inspection schedules; the operator follows one and records the choice in this plan: (a) 7-day schedule — inspect at least once every 7 calendar days (SDR100000 Section 4.2.1); or (b) 14-day schedule with storm inspections — inspect at least once every 14 calendar days and within 24 hours of a storm producing more than 0.25 inch of rain (also within 24 hours of snowmelt that generates runoff; keep a properly maintained rain gauge on the site) (SDR100000 Section 4.2.2). Every inspection is dated and signed, and any failed control is corrected before the next storm.

TriggerRequirement
Routine — 7-day scheduleAt least once every 7 calendar days
Routine — 14-day schedule with storm inspectionsAt least once every 14 calendar days and within 24 hours of a storm producing more than 0.25 inch of rain (also within 24 hours of snowmelt that generates runoff; keep a properly maintained rain gauge on the site)

How South Dakota differs from the federal permit

South DakotaFederal (EPA)
AuthorityDANRU.S. EPA
PermitSDR100000EPA CGP
Disturbance threshold1 acre1 acre
Plan nameSWPPPSWPPP

Because South Dakota administers its own program, the federal EPA Construction General Permit does not apply directly here — the state permit governs. Sites inside a regulated municipal storm sewer system may carry additional local ordinance requirements on top of the state permit.

Frequently asked questions

Does South Dakota require an engineer to prepare the SWPPP?+

No. South Dakota does not require a licensed PE stamp on a construction SWPPP statewide. The operator certifies the plan; engineer review is optional for complex sites.

What is the disturbance threshold in South Dakota?+

One acre — including sites under an acre that are part of a larger common plan of development totaling one acre or more.

How often must inspections happen in South Dakota?+

The permit allows 2 inspection schedules; the operator follows one and records the choice in this plan: (a) 7-day schedule — inspect at least once every 7 calendar days (SDR100000 Section 4.2.1); or (b) 14-day schedule with storm inspections — inspect at least once every 14 calendar days and within 24 hours of a storm producing more than 0.25 inch of rain (also within 24 hours of snowmelt that generates runoff; keep a properly maintained rain gauge on the site) (SDR100000 Section 4.2.2).

South Dakota-ready in minutes

Siltworks fills in your site data automatically, applies the South Dakota requirements, and hands you an inspection-ready SWPPP — at 70–90% less than a consultant.

Requirements summarized from the publicly available General Permit Authorizing Stormwater Discharges Associated with Construction Activities (SDR100000) (SDR100000) for planning purposes. The operator must review and certify every SWPPP before use.